Hire a Unit

SHARE THIS PAGE

Hire Pipeline Solutions

Avoid unnecessary capital expenditure when you hire equipment.

The benefits of equipment hire as an alternative to purchasing and why sourcing equipment on a case-by-case basis makes perfect sense.

It is often assumed that rental solutions are only for emergency breakdowns. However, with opportunities to avoid capital expenditure and receive first-rate maintenance, the benefits of short or long-term rental as part of an ongoing contingency plan, or even as a try-before-you-buy option, are clear.

Solutions available at Octopus Electronics

Troglotech T804 Camera System:

Troglotech Trogloprobe T804 Inspection System is the ultimate in ruggedness, reliability and ease of operation.

The simple, uncluttered appearance, belies the features included such as integral solid-state video recording, full function text writer with meterage display, eight-hour lightweight battery pack and mini-mainline ready controller.

Coupled with Troglotechs well proven T800 Troglocam Auto-uprighting forward-view HD camera and flexible configuration possibilities, Trogloprobe offers a fully featured inspection product with extensive potential for expansion. The Troglotech T804 is backed up by our specialised repair centre and qualified trained staff who will ensure your unit is fully functional with minimal downtime.

  • 61M of Rod
  • Display Unit
  • Integral DVR
  • RodCounter
  • Textwriter Keyboard
  • Power Cell
  • T800 camera
  • Skid set plus a mains charger is supplied

 

MaxProbe 60m Camera System:

The ultimate system, suitable for pipe sizes 17mm up to 450mm Ø. Maxprobe with 60m pushrod.

The MaxProbe control box is the heart of our system and is packed with innovative and helpful features to enhance user efficiency and provides everything you need to carry out a professional drainage survey. The Maxprobe system is available with a choice of cameras and coilers, all of which are interchangable.

System Features:

  • Embedded Wincan reporting software included
  • Future-proof software updates
  • Bespoke inbuilt Scanprobe reporting software as standard
  • 10.4” Super-bright sunlight readable LCD display with auto brightness
  • Battery: Rechargeable Li-ion with up to 9 hours running time
  • Flexible power saving options
  • Charging: via mains 100-240VAC or in-vehicle 12VDC
  • Wi-Fi and Bluetooth compatible and optional 4G
  • Snapshot-capture to JPEG image
  • Video recording to MPEG format
  • Designed to meet IP64 Ingress protection rating
  • Tough, waterproof and ergonomic qwerty keypad design
  • Comes as standard with 32Gb of internal memory (expandable up to 960Gb)
  • External storage & Connectivity: x2 USB 2.0 ports (supports up to 128Gb),
  • SD card slot (supports up to 32Gb), Ethernet port and VGA output
  • Sonde

 

Trenchless Moling

Moling technology is widely-used and ever increasing in the civil engineering fields .Compared to open-trenching this method of underground installation and renewal of supply and disposal pipelines has major technical and economic advantages. Shorter construction times are major advantages especially when providing property service connections like fibre installations or electrical cabling and when crossing busy roads.

GRUNDOMAT soil displacement technique

The pneumatically driven hammers work according to the soil displacement method, when moving forward the spoil is displaced into the surrounding soil. A channel is produced into which socket less short or long pipes up to OD 160 made of plastic (PE, PVC or PE-X) or cables can be pulled in. Depending on the type of soil, lengths of up to 25 m can either be pulled in simultaneously or later. A compressor with 6 – 7 bar operating pressure is required for this, with exact alignment of the machine towards the target necessary for high on-target accuracy.

Contact us for available sizes

QUICKLOCK Local Patch Repair System

Positioned by a crawler and expanded pneumatically, Quick-Lock’s rehab sleeve provides structural, trenchless pipe repair with heavy-gauge 316L stainless steel, plus infiltration abatement with an EPDM rubber gasket. Quick-Lock solves:

  • Infiltration.
  • Longitudinal cracks.
  • Circumferential cracks.
  • Holes.
  • Separated joints.
  • Offset joints.
  • Abandoned laterals.
  • Root intrusion.

It installs in minutes with minimal manpower and overhead. Quick-Lock is chemically resistant against sewage, thinned acids, lye, and aromatic and chlorinated hydrocarbons.

  • Quick-Lock sleeves are available in diameters ranging 6–32”, and in lengths of 16”, 19″ and 20”.
  • Multiple sleeves can be interleaved to perform longer repairs.
  • The sleeve design meets ASTM F3110-14 for mechanical trenchless point repair.

Point Repair: For standalone point repair, or for pre-lining under high infiltration, Quick-Lock sleeves restore a pipe’s structural integrity and seal out groundwater. They minimize diameter loss and outlast any other rehab.

Liner End Seal: Quick-Lock end caps strengthen a CIPP liner at its most vulnerable points—the ends. Stronger and easier to install than other end caps, they’re a must-have insurance policy for installed CIPP.


Call or email us for detailed costings as well as the terms and conditions of use

 

WhatsApp chat

Subscribe to our Monthly Newsletter